Mortgages

Self-Build & Renovation Finance

Funding released in stages against certified progress, for building a home from scratch or taking on a major renovation.

update Last updated 1 August 2026 list_alt 5 sections
Section 01

How staged funding works

Unlike a standard mortgage, the money does not arrive in one payment. It is released in tranches as the build reaches agreed milestones.

01

Land purchase

The first release, against the plot. You will usually need the largest proportion of your own funds at this point.

02

Foundations and structure

Released once the substructure is certified complete.

03

Wall plate and roof

Released when the shell is weathertight.

04

First and second fix

Services, plastering, joinery and fittings.

05

Completion and certification

Final release on practical completion, sign-off and warranty issue.

verified

Arrears or advance

Stages can be released in arrears (after the work, verified) or in advance (before it, against a certified plan). Advance release is easier on cash flow; arrears is more common. Confirm which you are getting before you budget.

Section 02

What we need to see

  • Full planning permission and, where required, building regulations approval.
  • A detailed costed schedule of works with a contingency, not a single headline figure.
  • The builder or main contractor, their track record and their insurance.
  • A structural warranty or latent defects policy for the finished building.
  • Site insurance covering the works, materials and public liability throughout.
  • Evidence of where you will live during the build, and how that is funded.
warning

Contingency is not optional

Build costs overrun far more often than they come in under. We expect a meaningful contingency in the schedule, and so should you.

Section 03

Terms

CriterionStandard position
Maximum loan to value70% of land plus build cost, or of end value where lower
Minimum deposit30%
Interest during the buildUsually interest-only on the amount drawn
On completionConverts to a standard residential mortgage on the products then available
ValuationRe-inspected at each stage, at your cost
Build periodAgreed at the outset, with extensions considered on evidence
Section 04

Where these projects go wrong

  • Underestimating cost, then running out of funds mid-build with an unmortgageable half-finished property.
  • Starting work before planning or approvals are fully in place.
  • Choosing a contractor on price alone, without checking references or insurance.
  • Forgetting the cost of living somewhere else for the duration.
  • Assuming the end value will cover any overspend. Valuers assess the finished house, not what it cost you.

None of this is a reason not to build. It is a reason to have the schedule, the contingency and the contractor settled before the first release.

Section 05

Next steps

Self-build cases are individually assessed and benefit from a conversation before a formal application. Bring the plans, the schedule and the contractor details.